As the European Union (EU) transitions towards a greener future, one of the most pivotal components is the development of a robust electric vehicle (EV) charging infrastructure. This initiative is driven by legislative mandates, ambitious targets, and substantial financial commitments. We delve into the progress made thus far, juxtapose the current installation rates with the required targets, and examine the costs involved.

Legislative Mandate and Targets

The cornerstone of the EU's push for a widespread EV charging infrastructure network is the Alternative Fuels Infrastructure Directive (AFID), specifically Directive 2014/94/EU. This directive mandates Member States to develop national policy frameworks for the market development of alternative fuels and their infrastructure, including EV charging points. According to the directive, the EU aims to have 1 million public EV charging points by 2025 and 3 million by 2030.

Current Progress and Installation Rates

As of early 2024, the EU has installed approximately 450,000 public EV charging points across its Member States. This represents significant progress but highlights the gap that remains to reach the 2025 and 2030 targets.

The installation rate of EV charging infrastructure has seen a notable increase in recent years. Between 2020 and 2023, the EU averaged approximately 100,000 new installations per year. This rate has accelerated in the last 18 months, with some Member States doubling their installation pace due to increased funding and streamlined regulatory processes.

To meet the 2025 target of 1 million charging points, the EU needs to install an additional 550,000 within the next two years, translating to an average charging infrastructure installation rate of approximately 23,000 per month. To achieve the 2030 target of 3 million charge points, an additional 2.55 million installations are required over six years, necessitating an average installation rate of about 425,000 per year.

Average Installation Cost

The cost of installing charging infrastructure varies significantly depending on the type (slow, fast, or ultra-fast), location, and associated infrastructure upgrades. On average, the cost per public charge point is estimated to be between €2,000 and €10,000. Fast and ultra-fast chargers, which are essential for long-distance travel and reducing charging times, are on the higher end of this spectrum. Thankfully the EU has earmarked substantial funds to support the development of EV charging infrastructure. The European Green Deal, complemented by the Connecting Europe Facility (CEF) and other national and regional funds, allocates billions of euros towards this endeavour. For example, the CEF Transport programme alone has dedicated approximately €1.5 billion for the period 2021-2027 specifically for alternative fuel infrastructure, including EV charging infrastructure.

Can the Target be Hit?

Given the current trajectory, meeting the 2025 target of 1 million charge points appears challenging but achievable with increased efforts. The 2030 target, however, requires a substantial acceleration in installation rates. Several factors could impede progress, including regulatory hurdles, funding shortfalls, and logistical challenges.

Mitigating Actions

To ensure the EU meets its ambitious targets, several strategies can be implemented:

Streamlining Permitting Processes: Simplifying and accelerating the permitting process for installing charge points can significantly boost installation rates. For example, Germany has implemented measures to reduce the bureaucratic burden on new installations, resulting in faster deployment of charging infrastructure.

Increasing Public-Private Partnerships: Encouraging collaborations between public authorities and private enterprises can leverage additional resources and expertise. The Netherlands has successfully implemented this approach, leading to one of the highest densities of charging infrastructure in the EU.

Enhancing Financial Incentives: Expanding subsidies and grants for EV charging infrastructure can stimulate more installations. Countries like France and Spain have increased their funding, resulting in a surge in new installations of charge points.

Focusing on High-Demand Areas: Prioritising installations in urban areas and along major transport corridors ensures that charge points are available where they are most needed. The Trans-European Transport Network (TEN-T) policy aims to address this by focusing on key corridors for EV charging infrastructure.

Will the EU Meet Its Targets?

While significant progress has been made, the path to meeting the 2025 and 2030 targets remains steep. By implementing strategic actions such as streamlining permitting processes, increasing public-private partnerships, enhancing financial incentives, focusing on high-demand areas, the EU can at the very least make sure that the majority of useable charging infrastructure deployed is in the correct locations for needy motorists.

However, the actual targets look to be slipping out of reach for 2030, and now near-impossible for 2025. So whilst next year we will likely see the target missed, when we look to 2030, as is the case with many things wrapped in European politics, things will not happen until they have to...

PAVE Insight provides expert business intelligence and strategic tools for the connected mobility industry.

We deliver customisable market insights, competitor analysis, industry forecasts, and detailed market reports across five key sectors. PAVE Insight's solutions can improve strategic decision-making with its proprietary databases, quarterly updates, and market insights in the connected vehicle industry.

For more information about our expertise, click here.